Pricing & Cost Guide
Transparent pricing for every service we offer. Every property is different, so these are ranges — not exact quotes. Contact us for a free on-site assessment and written quote.
All prices are estimates for Middle Tennessee projects. Actual pricing depends on property conditions, access, material costs, and scope of work. We provide free on-site assessments and written quotes before any work begins.
Brush Clearing
Most residential jobs: 1–2 days. Larger acreage: 3–5 days.
Mulching / Forestry Mulching
Typically 1–3 days for residential parcels.
Driveway Grading & Repair
Most grading jobs: 2–6 hours. Severe washouts may require a full day.
Gravel Driveway Installation
1–3 days for standard residential driveways.
Barn Pads
1–4 days depending on size.
Site Prep
2 days to 2 weeks depending on scope.
Land Restoration
2–7 days depending on scope.
Concrete Slabs
Pour day + 28 days cure time. Most prep and pour: 1–3 days on-site.
Concrete Foundations
1–3 weeks depending on scope and weather.
Concrete Sidewalks
1 day for most residential installs; larger commercial: 2–4 days.
Tree Removal
Most single trees: 2–4 hours. Multi-tree jobs: full day or more.
Tree Trimming
1–4 hours per tree depending on size.
What Affects Price?
- · Acreage / square footage of the project
- · Vegetation density and tree size
- · Terrain difficulty (slopes, wet ground)
- · Equipment access limitations
- · Material costs (gravel, concrete, etc.)
- · Haul-off vs. on-site disposal
How We Price
- · By the job — not by the hour
- · Free on-site assessment before quoting
- · Written quote with clear scope of work
- · No hidden fees or surprise charges
- · 25–50% deposit on larger projects
- · Cash, cashier's check, and cards accepted
Get Your Free Quote
Every property is different. The best way to get an accurate price is a free on-site assessment.
Get your estimate this week · Limited availability
